Instructions for installing quick coupler (QDC) for Ebara submersible wastewater pump

In industrial wastewater treatment systems, submersible pump maintenance is often difficult because the pump is located deep in a manhole full of water and waste. Quick Discharge Connector (QDC)Ebara’s is a breakthrough solution, allowing the pump to be lifted up and lowered to the operating position without having to remove bolts or wade into a hole.

Below are detailed instructions on the steps to install the QDC kit to ensure the system operates accurately and durably.

1. What does the QDC quick coupling kit include?

A standard Ebara QDC kit usually includes the following main components:

  • Base Connector:Fixed at the bottom of the manhole, directly connected to the discharge pipe.

  • Adapter/Sliding Bracket:Installed in the pump discharge nozzle.

  • Guide Rail:Usually two stainless steel or galvanized steel pipes (customers provide their own according to the depth of the hole).

  • Upper Holder:Fix the top of the guide bar to the wall of the manhole.

2. Detailed installation process

Step 1: Fix the QDC base

This is the most important step that determines the accuracy of the entire system.

  • Place the base on the bottom of the manhole at the designed location.

  • Connect the base flange to the main discharge pipe.

  • Use a laser level or level to make sure the base stays level completely flat.

  • Drill and tighten anchor bolts to secure the base to the concrete floor.

Step 2: Install guide rails (Guide Rails)

  • Insert the two guide tubes into the holes provided on the QDC stand.

  • Stand the guide bar upright and install the Upper Holder to the wall of the manhole.

  • Note:The guide bar must be secure Absolutely vertical. If tilted, the pump will jam when pulled up or will not fit securely into the base when lowered.

Step 3: Install the connection bracket to the pump

  • Remove the temporary fittings on the discharge port of the Ebara pump.

  • Install the adapter to the pump flange. Be sure to use the included rubber gasket to avoid pressure leaks at this location.

  • Tighten the connection bolts between the pump and the mount.

Step 4: Drop the pump into position

  • Hook the lifting chain to the pump handle.

  • Insert both ears of the connecting mount into the two guide bars.

  • Slowly lower the pump. The weight of the pump will automatically push the connecting jaw to slide along the guide bar and fit tightly into the bottom base.

  • Check:When the pump touches the bottom, gravity will create a natural seal (or through a U-shaped rubber gasket depending on the model) between the mount and the base.

3. “Golden” notes when installing QDC for Ebara pumps

Guide bar clearance:> The guide bar should not be too long without an intermediate support if the manhole is over 4m deep. Vibration can cause the joint to misalign.

  • Using specialized lifting chains:Always use stainless steel chains (Stainless Steel 304/316) to avoid rust. Absolutely do not use electric cables to pull the pump.

  • Check tightness:After installation is complete, test operate it. If you see water spraying back at the connection between the mount and the base, it means the system is misaligned or there is debris stuck in the middle of the contact surface.

  • Lubrication:You can apply a layer of water-resistant grease to the guide bar to make the pump slide down more smoothly during the first installation.


4. Benefits of using the Ebara QDC set in industry

  • Labor safety:Maintenance staff do not need to go down into toxic manholes.

  • Save time:Disassembling the pump to check impellers or seals only takes a few minutes instead of hours.

  • Increase pipe life:No more removing/installing flanges many times, causing damage to threads and pipe gaskets.

T&C INDUSTRIAL DISTRIBUTION JOINT STOCK COMPANY (TCID)

  • Hotline: 0909 12 99 00
  • Website:ebaravietnam.vn/
  • Address:384/42 Nam Ky Khoi Nghia, Xuan Hoa Ward, Ho Chi Minh